Articles
Instrumentation report
Validation reports
- TNO2018R10762 Verification of ZephIR 300 unit 315 at ECN part of TNO LiDAR Calibration Facility, for offshore measurements at Euro Platform (EPL)
- TNO2021R10132 Validation of the TNO ZX300 LiDAR system unit 308 at the TNO RSD Verification Facility Period July 2019 to September 2019
Windconditions